Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD/B Heidebahn








Mountain Station
Mountain Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Soelden
resort White 5
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Heidebahn 
Type 4-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2001 
Commissioning date 2001

geometric data  
Height of valley station 1952,1 m
Height of mountain station 2427,84 m
Vertical rise 475,70 m
Route distance 1620,22 m
Horizontal length 1542 m
Average incline 30,85 %
Largest incline 53,35 %
Number of pillars 18 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 5,2 m
Trackwidth line 5,2 m
Trackwidth return 5,2 m
Angle of wrap (drive wheel) 180 °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 5,4 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope 3296,45 m
Total weight of haul rope ?? t
Haul rope diameter 41 mm
Nominal strength of haul rope 1770 N/mm²
Breaking strength of rope 1230 kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ??
Power control system Elin 
Number of drive 2 Stk
Drive power (Start) ?? kW
Drive power (Operation) 551 kW
Brake power -58 kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive ??

cabins data  
Grip type DT 104
Cab manufacturer Doppelmayr
Cab model 4E98/B
Bubble colour neutral
Seating leather
Seat heater no
Persons per cab
Number of cabs 115 Stk
Cab distance 30,0 m
Cab interval 6,0 s
Garage type underground
Garage place valley station
Garage direction forward
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway no
Integrated rescue system no
Rope position control no
Asset number (Trail map) A 13 




This information are for members only visible!



Updates
Datas: 10/05/15 15:51:43
PHOTOS: 10/10/03 12:37:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
11134 visit(s) since 01/12/02
Last visit 19/09/19

LIFT-WORLD IDs
Lift-ID: 85
Place-ID: 1

https://www.seilbahntechnik.net/en/lifts/85/datas.htm