Lift-Database » Lifts in the world
6-CLD/B Plateau
Line
Line
Mountain station
General information | |
---|---|
Place | Olang / Valdaora |
resort | Dolomiti Superski |
Region | Trentino-South Tyrol |
Country | |
Name of lift | Plateau |
Type | 6-CLD/B |
Lift manufacturer | Leitner |
Year of construction | 1996 |
Commissioning date | ?? |
Date of closing down | 14/04/24 |
Date of pull down | 05 / 2024 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
Initial construction until 2016: Conveying capacity: 2445 pers/h Number of equipment: 59 Equipment spacing: 43.2 m Operating equipment cycle time: 8.84 s rebuild in Deschney (Tschechien) |
geometric data | |
---|---|
Height of valley station | 2029,1 m |
Height of mountain station | 2277,4 m |
Vertical rise | 248,3 m |
Route distance | 1219,79 m |
Horizontal length | 1193,57 m |
Average incline | 21 % |
Largest incline | ?? % |
Number of pillars | 12 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | 5,80 m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 2500 Pers/h |
Travel time | 4,1 min |
Driving speed line | 5,0 m/s |
Driving speed station | ?? m/s |
electrical data | |
---|---|
Electrical control | ?? |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | 2 Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | 460 kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Valley station |
Drive type | electrical |
Traction of drive | electromechanical |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Leitner |
Cab model | ?? |
Bubble colour | blue |
Seating | leather |
Seat heater | no |
Persons per cab | 6 |
Number of cabs | 60 Stk |
Cab distance | 43,18 m |
Cab interval | 8,64 s |
Garage type | underground |
Garage place | valley station |
Garage direction | ?? |
Loading direction | ?? |
rope data | |
---|---|
Rope manufacturer | Fatzer |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | 44 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Mountain station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | ?? % |
Drive direction | left |
Construction costs | ?? |
Currency (Construction costs) | ?? |
Construction period | ?? months |
Seasontime | ❄ winter |
Situation of entrance | parallel |
Situation of exit | parallel |
Loading carpet | yes |
Evacuation ropeway | no |
Integrated rescue system | no |
Rope position control | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: 31/12/24
PHOTOS: ??
Lift-Statistics
18542 visit(s) since 18/12/03
Last visit 15/01/25
LIFT-WORLD IDs
Lift-ID: 87
Place-ID: 1496
https://www.seilbahntechnik.net/en/lifts/87/datas.htm
Datas: 31/12/24
PHOTOS: ??
Lift-Statistics
18542 visit(s) since 18/12/03
Last visit 15/01/25
LIFT-WORLD IDs
Lift-ID: 87
Place-ID: 1496
https://www.seilbahntechnik.net/en/lifts/87/datas.htm