Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD/B Monte Pana - Mont de Seura








valley station
valley station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place St. Christina
resort
Dolomiti Superski
Region Trentino-Alto Adige
Country IT Italy, Italia
Name of lift Monte Pana - Mont de Seura 
Type 4-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2005 
Commissioning date ??

geometric data  
Height of valley station 1626,0 m
Height of middle station(s) ?? m
Height of mountain station 2042,00 m
Vertical rise 416,00 m
Route distance 1592,25 m
Horizontal length ?? m
Average incline 27,55 %
Largest incline ?? %
Number of pillars 19 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,20 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1600 (2200) Pers/h
Travel time 5,3 min
Driving speed line 5,00 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 40 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type ??
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 348 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type A104C
Cab manufacturer Doppelmayr
Cab model 4E98/B
Bubble colour
Seating ??
Seat heater no
Persons per cab
Number of cabs 75 (103) Stk
Cab distance 45,00 (32,73) m
Cab interval 9,00 (6,50) s
Garage type ??
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Situation of entrance ??
Situation of exit parallel
Loading carpet ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 21/11/15 22:07:43
PHOTOS: 18/02/07 13:35:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
9875 visit(s) since 17/12/05
Last visit 14/10/19

LIFT-WORLD IDs
Lift-ID: 8808
Place-ID: 1603

https://www.seilbahntechnik.net/en/lifts/8808/datas.htm