Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD/B Chalberhöni – Les Gouilles












Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Rougemont
resort Gstaad - Saanen - Rougemont
Region Vaud
Country CH Switzerland, Confoederatio Helvetica
Name of lift Chalberhöni – Les Gouilles 
Type 4-CLD/B 
Lift manufacturer Garaventa 
Year of construction 2005 
Commissioning date 2005

geometric data  
Height of valley station 1348 m
Height of mountain station 2016 m
Vertical rise 668 m
Route distance 2873 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 27 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1500 (2000) Pers/h
Travel time 9,8 min
Driving speed line 5 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Frey 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 567 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ??
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 104G
Cab manufacturer Doppelmayr
Cab model 4E98
Bubble colour
Seating ??
Seat heater no
Persons per cab
Number of cabs 123 (164) Stk
Cab distance ?? m
Cab interval ?? s
Garage type ??
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 4,5 months
Seasontime ??
Situation of entrance 90°
Situation of exit parallel
Loading carpet ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 21/01/18 15:22:34
PHOTOS: 03/03/14 11:23:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
3216 visit(s) since 18/12/05
Last visit 20/10/19

LIFT-WORLD IDs
Lift-ID: 8842
Place-ID: 2196

https://www.seilbahntechnik.net/en/lifts/8842/datas.htm