Lift-Database » Lifts in the world
1-CLF Hohe Salve Bahn II
General information | |
---|---|
Place | Hopfgarten |
resort | ?? |
Region | Tyrol |
Country | |
Name of lift | Hohe Salve Bahn II |
Type | 1-CLF |
Lift manufacturer | Felix Wopfner |
Year of construction | 1956 |
Commissioning date | 22/12/56 |
Date of closing down | 1982 |
Date of pull down | 1982 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 1156 m |
Height of mountain station | 1532 m |
Vertical rise | 376 m |
Route distance | 1048 m |
Horizontal length | ?? m |
Average incline | 37 % |
Largest incline | 42 % |
Number of pillars | 19 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 359 Pers/h |
Travel time | 9,4 min |
Driving speed line | 1,85 m/s |
electrical data | |
---|---|
Electrical control | ?? |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Mountain station |
Drive type | ?? |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Felix Wopfner |
Cab model | ?? |
Seating | none |
Seat heater | no |
Persons per cab | 1 |
Number of cabs | 110 Stk |
Cab distance | ?? m |
Cab interval | ?? s |
rope data | |
---|---|
Rope manufacturer | ?? |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | ?? mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | ?? |
Tension type | ?? |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | ?? % |
Drive direction | left |
Construction costs | ?? ATS |
Currency (Construction costs) | Austrian schilling |
Construction period | ?? months |
Seasontime | ❄ ☀ all-season |
Loading carpet | no |
Evacuation ropeway | ?? |
Integrated rescue system | ?? |
Asset number (Trail map) | 21 |
Updates
Datas: 27/02/24
PHOTOS: ??
Lift-Statistics
12561 visit(s) since 14/03/06
Last visit 30/12/24
LIFT-WORLD IDs
Lift-ID: 9153
Place-ID: 76
https://www.seilbahntechnik.net/en/lifts/9153/datas.htm
Datas: 27/02/24
PHOTOS: ??
Lift-Statistics
12561 visit(s) since 14/03/06
Last visit 30/12/24
LIFT-WORLD IDs
Lift-ID: 9153
Place-ID: 76
https://www.seilbahntechnik.net/en/lifts/9153/datas.htm