Lift-Database » Lifts in the world
3-CLF Pierre Plate
Valley Station
Line
General information | |
---|---|
Place | Saint-Gervais-les-Bains |
resort | Evasion Mont Blanc |
Region | Rhône-Alpes |
Country | |
Name of lift | Pierre Plate |
Type | 3-CLF |
Lift manufacturer | Poma |
Year of construction | 1985 |
Commissioning date | ?? |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 1340 m |
Height of middle station(s) | ?? m |
Height of mountain station | 1441 m |
Vertical rise | 101 m |
Route distance | 412 m |
Horizontal length | 399 m |
Average incline | 25 % |
Largest incline | 49 % |
Number of pillars | 6 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | 3,2 m |
Trackwidth line | ?? m |
Trackwidth return | 3,55 m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 1500 Pers/h |
Travel time | 3,44 min |
Driving speed line | 2,0 m/s |
electrical data | |
---|---|
Electrical control | ?? |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | 130 kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Valley station |
Drive type | electrical |
Traction of drive | electromechanical |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Poma |
Cab model | ?? |
Seating | leather |
Seat heater | no |
Persons per cab | 3 |
Number of cabs | 58 Stk |
Cab distance | 14,4 m |
Cab interval | 7,2 s |
rope data | |
---|---|
Rope manufacturer | Tréfileurope |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | 36 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | ?? % |
Drive direction | left |
Construction costs | ?? |
Currency (Construction costs) | ?? |
Construction period | ?? months |
Seasontime | ❄ winter |
Loading carpet | no |
Evacuation ropeway | no |
Integrated rescue system | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: 10/09/22
PHOTOS: ??
Lift-Statistics
4852 visit(s) since 04/12/06
Last visit 20/12/24
LIFT-WORLD IDs
Lift-ID: 9786
Place-ID: 1192
https://www.seilbahntechnik.net/en/lifts/9786/datas.htm
Datas: 10/09/22
PHOTOS: ??
Lift-Statistics
4852 visit(s) since 04/12/06
Last visit 20/12/24
LIFT-WORLD IDs
Lift-ID: 9786
Place-ID: 1192
https://www.seilbahntechnik.net/en/lifts/9786/datas.htm