Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD/B Kettingbahn












Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Zell am See
resort Schmittenhoehe
Region Salzburg
Country AT Austria, Österreich
Name of lift Kettingbahn 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2009 
Commissioning date 2009

geometric data  
Height of valley station 1656 m
Height of mountain station 1968 m
Vertical rise 312 m
Route distance 962 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 8 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,10 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3200 Pers/h
Travel time 3,65 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 47 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 108
Cab manufacturer Doppelmayr
Cab model CS10
Bubble colour neutral
Seating leather
Seat heater yes
Persons per cab
Number of cabs 64 Stk
Cab distance ?? m
Cab interval 6,8 s
Garage type underground
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ??  EUR 
Currency (Construction costs) Euro 
Construction period 4,5 months
Seasontime winter
Situation of entrance 90°
Situation of exit parallel
Loading carpet yes
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) 12 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 13/01/21 19:08:44
PHOTOS: 05/12/09 22:19:00

Lift-Statistics
13519 visit(s) since 17/09/09
Last visit 20/10/21

LIFT-WORLD IDs
Lift-ID: 14075
Place-ID: 252

https://www.seilbahntechnik.net/en/lifts/14075/datas.htm