Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Kettingbahn










General information  
Place Zell am See 
resort Ski Alpin Card 
Region Salzburg 
Country   
Name of lift Kettingbahn 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2009 
Commissioning date 2009 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1656 m
Height of mountain station 1968 m
Vertical rise 312 m
Route distance 962 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 8 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,10 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3200 Pers/h
Travel time 3,65 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer Doppelmayr 
Cab model CS10 
Bubble colour neutral 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 64 Stk
Cab distance ?? m
Cab interval 6,8 s
Garage type underground 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 47 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 4,5 months
Seasontime winter 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) 12 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 25/07/22
PHOTOS: ??

Lift-Statistics
17249 visit(s) since 17/09/09
Last visit 19/04/24

LIFT-WORLD IDs
Lift-ID: 14075
Place-ID: 252

https://www.seilbahntechnik.net/en/lifts/14075/datas.htm