Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD/B Roßalm


Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place St. Andrä/Brixen, Bressanone
resort
Dolomiti Superski

Region Trentino-Alto Adige
Country IT Italy, Italia
Name of lift Roßalm 
Type 6-CLD/B 
Lift manufacturer Leitner 
Year of construction 2010 
Commissioning date ??

geometric data  
Height of valley station 2187,2 m
Height of mountain station 2508,7 m
Vertical rise 321,5 m
Route distance 1099,2 m
Horizontal length 1042 m
Average incline ?? %
Largest incline ?? %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,10 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1697 (2400) Pers/h
Travel time 3,4 min
Driving speed line 5 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 47 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 560 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Leitner
Cab model ??
Bubble colour
Seating ??
Seat heater no
Persons per cab
Number of cabs 38 Stk
Cab distance 63,9 m
Cab interval 12,7 s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 4 months
Seasontime ??
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 21/11/15 22:03:19
PHOTOS: 20/03/18 19:52:19

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
7592 visit(s) since 15/11/10
Last visit 23/10/19

LIFT-WORLD IDs
Lift-ID: 15035
Place-ID: 1602

https://www.seilbahntechnik.net/en/lifts/15035/datas.htm