Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Roßalm

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place St. Andrä/Brixen, Bressanone 
resort ?? 
Region Trentino-South Tyrol 
Country   
Name of lift Roßalm 
Type 6-CLD/B 
Lift manufacturer Leitner 
Year of construction 2010 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 2187,2 m
Height of mountain station 2508,7 m
Vertical rise 321,5 m
Route distance 1099,2 m
Horizontal length 1042 m
Average incline ?? %
Largest incline ?? %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,10 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1697 (2400) Pers/h
Travel time 3,4 min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) 560 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type LPA 
Cab manufacturer Leitner 
Cab model ?? 
Bubble colour neutral 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 38 Stk
Cab distance 63,9 m
Cab interval 12,7 s
Garage type ground floor 
Garage place valley station 
Garage direction forward 
Loading direction backward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 47 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 4 months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) 105 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 04/04/24
PHOTOS: ??

Lift-Statistics
17737 visit(s) since 15/11/10
Last visit 27/12/24

LIFT-WORLD IDs
Lift-ID: 15035
Place-ID: 1602

https://www.seilbahntechnik.net/en/lifts/15035/datas.htm