Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD/B Waldkopfbahn


Line
Line

Waldkopfbahn
Waldkopfbahn

Valley Station
Valley Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Bayrischzell
resort Sudelfeld
Region Bavaria, Bayern
Country DE Germany, Deutschland
Name of lift Waldkopfbahn 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2014 
Commissioning date 28/12/14

geometric data  
Height of valley station 1029 m
Height of mountain station 1254 m
Vertical rise 226 m
Route distance 710 m
Horizontal length 634 m
Average incline 73 %
Largest incline ?? %
Number of pillars 7 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2800 Pers/h
Travel time 3 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope 1960 N/mm²
Breaking strength of rope 1400 kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 354 kW
Drive power (Operation) 280 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 106
Cab manufacturer Doppelmayr
Cab model CS10
Bubble colour blue
Seating leather
Seat heater yes
Persons per cab
Number of cabs 41 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction backward
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 8 months
Seasontime winter
Situation of entrance 90°
Situation of exit parallel
Loading carpet yes
Evacuation ropeway no
Integrated rescue system no
Rope position control yes
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 01/09/17 20:53:39
PHOTOS: 05/04/16 21:13:45

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
8858 visit(s) since 06/12/14
Last visit 16/09/19

LIFT-WORLD IDs
Lift-ID: 17743
Place-ID: 159

https://www.seilbahntechnik.net/en/lifts/17743/datas.htm