Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Waldkopfbahn

Line
Line

Waldkopfbahn
Waldkopfbahn

Valley Station
Valley Station

General information  
Place Bayrischzell 
resort Wendelstein 
Region Bavaria 
Country   
Name of lift Waldkopfbahn 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2014 
Commissioning date 28/12/14 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1029 m
Height of mountain station 1254 m
Vertical rise 226 m
Route distance 710 m
Horizontal length 634 m
Average incline 73 %
Largest incline ?? %
Number of pillars 7 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2800 Pers/h
Travel time 3 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 354 kW
Drive power (Operation) 280 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 106 
Cab manufacturer Doppelmayr 
Cab model CS10 
Bubble colour blue 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 41 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope 1960 N/mm²
Breaking strength of rope 1400 kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 8 months
Seasontime winter 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 13/05/21
PHOTOS: ??

Lift-Statistics
13347 visit(s) since 06/12/14
Last visit 27/03/24

LIFT-WORLD IDs
Lift-ID: 17743
Place-ID: 159

https://www.seilbahntechnik.net/en/lifts/17743/datas.htm