Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD/B Engstlensee - Jochpass





Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Engelberg
resort
Region Obwalden
Country CH Switzerland, Confoederatio Helvetica
Name of lift Engstlensee - Jochpass 
Type 6-CLD/B 
Lift manufacturer Garaventa 
Year of construction 2019 
Commissioning date 07/12/19

geometric data  
Height of valley station ?? m
Height of mountain station ?? m
Vertical rise 260 m
Route distance 1244 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 4,67 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type ??
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive ??
Emergency drive diesel engine
Traction of emergency drive electrical

cabins data  
Grip type D3000
Cab manufacturer Doppelmayr
Cab model DCD 6
Bubble colour neutral
Seating Icolan
Seat heater yes
Persons per cab
Number of cabs 51 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place mountain station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ??  CHF 
Currency (Construction costs) Swiss franc 
Construction period 7,5 months
Seasontime ❄ ☀ all-season
Situation of entrance 90°
Situation of exit 90°
Loading carpet no
Evacuation ropeway no
Integrated rescue system no
Rope position control no
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 09/01/21 20:03:40
PHOTOS: ????

Lift-Statistics
1601 visit(s) since 02/02/20
Last visit 13/06/21

LIFT-WORLD IDs
Lift-ID: 19127
Place-ID: 179

https://www.seilbahntechnik.net/en/lifts/19127/datas.htm