Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Engstlensee - Jochpass



General information  
Place Engelberg 
resort ?? 
Region Obwalden 
Country   
Name of lift Engstlensee - Jochpass 
Type 6-CLD/B 
Lift manufacturer Garaventa 
Year of construction 2019 
Commissioning date 07/12/19 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1954 m
Height of mountain station 2215 m
Vertical rise 261 m
Route distance 1244 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 4,67 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type D3000 
Cab manufacturer Doppelmayr 
Cab model DCD 6 
Bubble colour neutral 
Seating Icolan 
Seat heater yes 
Persons per cab
Number of cabs 51 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place mountain station 
Garage direction forward 
Loading direction backward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? CHF
Currency (Construction costs) Swiss franc 
Construction period 7,5 months
Seasontime ❄ ☀ all-season 
Situation of entrance 90° 
Situation of exit 90° 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 08/05/23
PHOTOS: ??

Lift-Statistics
4200 visit(s) since 02/02/20
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 19127
Place-ID: 179

https://www.seilbahntechnik.net/en/lifts/19127/datas.htm