Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD l'Epaule





Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Saint-Nicolas-de-Véroce
resort
Region Rhône-Alpes
Country FR France
Name of lift l'Epaule 
Type 6-CLD 
Lift manufacturer Poma 
Year of construction 2017 
Commissioning date ??

geometric data  
Height of valley station 1868 m
Height of mountain station 2134 m
Vertical rise 266 m
Route distance 803 m
Horizontal length 778 m
Average incline 34 %
Largest incline 79 %
Number of pillars 7 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 4,9 m
Trackwidth line 6,1 m
Trackwidth return 4,9 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2350 Pers/h
Travel time 2,47 min
Driving speed line 5,5 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ArcelorMittal 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Semer 
Remote control and telemonitoring system Semer 
Power control system Semer 
Number of drive 1 Stk
Drive power (Start) 340 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive direct drive
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type LPA-M
Cab manufacturer Poma
Cab model ??
Seating leather
Seat heater ??
Persons per cab
Number of cabs 37 Stk
Cab distance 50 m
Cab interval 9,1 s
Garage type emergency rail
Garage place valley station
Garage direction forward
Loading direction backward

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs 5,150,000  EUR 
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter
Situation of entrance parallel
Situation of exit 90°
Loading carpet no
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 01/05/20 17:18:54
PHOTOS: ????

Lift-Statistics
111 visit(s) since 01/05/20
Last visit 25/10/20

LIFT-WORLD IDs
Lift-ID: 19609
Place-ID: 1200

https://www.seilbahntechnik.net/en/lifts/19609/datas.htm