  6-CLD l'Epaule



General information  
Place Saint-Nicolas-de-Véroce 
resort Evasion Mont Blanc 
Region Rhône-Alpes 
Country   
Name of lift l'Epaule 
Type 6-CLD 
Lift manufacturer Poma 
Year of construction 2017 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1868 m
Height of mountain station 2134 m
Vertical rise 266 m
Route distance 803 m
Horizontal length 778 m
Average incline 34 %
Largest incline 79 %
Number of pillars 7 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 4,9 m
Trackwidth line 6,1 m
Trackwidth return 4,9 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2350 Pers/h
Travel time 2,47 min
Driving speed line 5,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Semer 
Remote control and telemonitoring system Semer 
Power control system Semer 
Number of drive 1 Stk
Drive power (Start) 340 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive direct drive 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type LPA-M 
Cab manufacturer Poma 
Cab model ?? 
Seating leather 
Seat heater ?? 
Persons per cab
Number of cabs 37 Stk
Cab distance 50 m
Cab interval 9,1 s
Garage type emergency rail 
Garage place valley station 
Garage direction forward 
Loading direction backward 


rope data  
Rope manufacturer ArcelorMittal 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit 90° 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 01/05/20
PHOTOS: ??

Lift-Statistics
1854 visit(s) since 01/05/20
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 19609
Place-ID: 1200

https://www.seilbahntechnik.net/en/lifts/19609/datas.htm