Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD Tanvaldský Špičák 1



General information  
Place Tanvald 
resort ?? 
Region Liberecký 
Country   
Name of lift Tanvaldský Špičák 1 
Type 4-CLD 
Lift manufacturer Leitner 
Year of construction 2025 
Commissioning date ?? 
Second-hand lift. Formerly lift no. 2008 


Infos for handicapped persons
Sorry, no information available.

Characteristics
second-Hand Lift from Zell am Ziller (Krimml X-Press)

geometric data  
Height of valley station 543 m
Height of mountain station 813 m
Vertical rise 270 m
Route distance 1140 m
Horizontal length 1107 m
Average incline 24,39 %
Largest incline ?? %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2150 Pers/h
Travel time 4,2 min
Driving speed line 4,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 470 kW
Drive power (Operation) 400 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Leitner 
Cab model ?? 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 85 Stk
Cab distance 27 m
Cab interval 6 s
Garage type none 
Garage place nowhere 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 42 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? CZK
Currency (Construction costs) Czech koruna 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 29 Nov 2025
PHOTOS: ??

Lift-Statistics
264 visit(s) since 4 Nov 2025
Last visit 4 Dec 2025

LIFT-WORLD IDs
Lift-ID: 26057
Place-ID: 1712

https://www.seilbahntechnik.net/en/lifts/26057/datas.htm