Characteristics
Last 3-CLD on the Arlberg.

General information  
Place St. Anton am Arlberg
resort Ski Arlberg
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Schindlergratbahn 
Type 3-CLD 
Lift manufacturer Doppelmayr 
Year of construction 1981 
Commissioning date 15/03/81
Date of closing down 22/04/19
Date of pull down 23/04/19

geometric data  
Height of valley station 2048 m
Height of mountain station 2643 m
Vertical rise 595 m
Route distance 1484,3 m
Horizontal length 1333,4 m
Average incline 44,62 %
Largest incline 89,41 %
Number of pillars 18 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4,4 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2160 Pers/h
Travel time 6,2 min
Driving speed line 4,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type rope tension weight
Tension way ?? m

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ??
Power control system ??
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) 560 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive ??

cabins data  
Grip type VR102
Cab manufacturer Doppelmayr
Cab model ??
Seating Icolan
Seat heater no
Persons per cab
Number of cabs 165 Stk
Cab distance 20 m
Cab interval 5,0 s
Garage type ground floor
Garage place valley station
Garage direction forward
Loading direction forward

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ??  ATS 
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway yes
Integrated rescue system ??
Rope position control no
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 11/02/20 21:13:51
PHOTOS: 10/04/06 20:30:00

Lift-Statistics
24683 visit(s) since 07/10/03
Last visit 30/05/20

LIFT-WORLD IDs
Lift-ID: 3029
Place-ID: 288

https://www.seilbahntechnik.net/en/lifts/3029/datas.htm