Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  3-CLD Schindlergratbahn

Line
Line







General information  
Place St. Anton am Arlberg 
resort Ski Arlberg 
Region Tyrol 
Country   
Name of lift Schindlergratbahn 
Type 3-CLD 
Lift manufacturer Doppelmayr 
Year of construction 1981 
Commissioning date 15/03/81 
Date of closing down 22/04/19 
Date of pull down 23/04/19 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Last 3-CLD on the Arlberg.

geometric data  
Height of valley station 2048 m
Height of mountain station 2643 m
Vertical rise 595 m
Route distance 1484,3 m
Horizontal length 1333,4 m
Average incline 44,62 %
Largest incline 89,41 %
Number of pillars 24 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4,4 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2160 (1895) Pers/h
Travel time 6,2 (7,1) min
Driving speed line 4,0 (3,5) m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) 560 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type VR102 
Cab manufacturer Doppelmayr 
Cab model ?? 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 165 Stk
Cab distance 20 m
Cab interval 5,0 (5,7) s
Garage type ground floor 
Garage place valley station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway yes 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 02/02/22
PHOTOS: ??

Lift-Statistics
40957 visit(s) since 07/10/03
Last visit 19/03/24

LIFT-WORLD IDs
Lift-ID: 3029
Place-ID: 288

https://www.seilbahntechnik.net/en/lifts/3029/datas.htm