Characteristics
Baco curve
Baco-clamp with Reject hood

General information  
Place Pontresina
resort
Region Grisons
Country CH Switzerland, Confoederatio Helvetica
Name of lift Pontresina-Alp Languard 
Type 2-CLF 
Lift manufacturer Poma 
Year of construction 1990 
Commissioning date 20/01/91

geometric data  
Height of valley station 1844,3 m
Height of middle station(s) 1939,8 m
Height of mountain station 2332,31 m
Vertical rise 497,96 m
Route distance 1348,22 m
Horizontal length 1247,25 m
Average incline 38,90 %
Largest incline 67,25 %
Number of pillars 17 Stk
Greatest spanwidth 152, m
Max ground clearance 15 m
Trackwidth drive 3,4 m
Trackwidth line 4,2 m
Trackwidth return 4,2 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site 4 m
Maximum capacity 385 Pers/h
Travel time 14,9 min
Driving speed line 1,5 m/s

rope data  
Rope manufacturer Drahtseilwerke Brugg 
Length of haul rope 2709,45 m
Total weight of haul rope 10,1 t
Haul rope diameter 33 mm
Nominal strength of haul rope 2060 N/mm²
Breaking strength of rope 761 kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way 3,75 m

electrical data  
Electrical control SISAG 
Remote control and telemonitoring system SISAG 
Power control system SISAG 
Number of drive 1 Stk
Drive power (Start) 155 kW
Drive power (Operation) 131 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive hydrostatic

cabins data  
Grip type ??
Cab manufacturer Poma
Cab model 2E Fix
Seating polystyrene
Seat heater no
Persons per cab
Number of cabs 96 Stk
Cab distance 28,3 m
Cab interval 18,8 s

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period 6 months
Seasontime summer
Loading carpet no
Evacuation ropeway no
Integrated rescue system yes
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 27/09/15 11:37:49
PHOTOS: 21/10/09 20:14:00

Lift-Statistics
9449 visit(s) since 06/10/03
Last visit 28/01/21

LIFT-WORLD IDs
Lift-ID: 3430
Place-ID: 393

https://www.seilbahntechnik.net/en/lifts/3430/datas.htm