Lift-Database » Lifts in the world
2-CLF Pontresina - Alp Languard

Line

Mountain Station

Mountain Station
| General information | |
|---|---|
| Place | Pontresina |
| resort | ?? |
| Region | Grisons |
| Country | |
| Name of lift | Pontresina - Alp Languard |
| Type | 2-CLF |
| Lift manufacturer | Poma |
| Year of construction | 1990 |
| Commissioning date | 20 janv. 1991 |
| Infos for handicapped persons |
|---|
| Sorry, no information available. |
| Characteristics |
|---|
| Baco curve Baco-clamp with Reject hood |
| geometric data | |
|---|---|
| Height of valley station | 1844,3 m |
| Height of middle station(s) | 1939,8 m |
| Height of mountain station | 2332,31 m |
| Vertical rise | 497,96 m |
| Route distance | 1348,22 m |
| Horizontal length | 1247,25 m |
| Average incline | 38,90 % |
| Largest incline | 67,25 % |
| Number of pillars | 17 Stk |
| Greatest spanwidth | 152, m |
| Max ground clearance | 15 m |
| Trackwidth drive | 3,4 m |
| Trackwidth line | 4,2 m |
| Trackwidth return | 4,2 m |
| Angle of wrap (drive wheel) | ?? ° |
| Drive altitude of site | 4 m |
| Maximum capacity | 385 Pers/h |
| Travel time | 14,9 min |
| Driving speed line | 1,5 m/s |
| electrical data | |
|---|---|
| Electrical control | SISAG |
| Remote control and telemonitoring system | SISAG |
| Power control system | SISAG |
| Number of drive | 1 Stk |
| Drive power (Start) | 155 kW |
| Drive power (Operation) | 131 kW |
| Brake power | ?? kW |
| Continuous brake power | ?? kW |
| Driving station | Valley station |
| Drive type | electrical |
| Traction of drive | electromechanical |
| Emergency drive | diesel engine |
| Traction of emergency drive | hydrostatic |
| cabins data | |
|---|---|
| Grip type | ?? |
| Cab manufacturer | Poma |
| Cab model | 2E Fix |
| Seating | polystyrene |
| Seat heater | no |
| Persons per cab | 2 |
| Number of cabs | 96 Stk |
| Cab distance | 28,3 m |
| Cab interval | 18,8 s |
| rope data | |
|---|---|
| Rope manufacturer | Drahtseilwerke Brugg |
| Length of haul rope | 2709,45 m |
| Total weight of haul rope | 10,1 t |
| Haul rope diameter | 33 mm |
| Nominal strength of haul rope | 2060 N/mm² |
| Breaking strength of rope | 761 kN |
| Tensionstation haulrope | Valley station |
| Tension type | hydraulical (controlled) |
| Tension way | 3,75 m |
| miscellaneous data | |
|---|---|
| Transport uphill | 100 % |
| Transport downhill | 100 % |
| Drive direction | right |
| Construction costs | ?? |
| Currency (Construction costs) | ?? |
| Construction period | 6 months |
| Seasontime | ☀ summer |
| Loading carpet | no |
| Evacuation ropeway | no |
| Integrated rescue system | yes |
| Autonomous ropeway | no |
| Asset number (Trail map) | ?? |
Updates
Datas: 20 août 2022
PHOTOS: ??
Lift-Statistics
18489 visit(s) since 6 oct. 2003
Last visit 15 nov. 2025
LIFT-WORLD IDs
Lift-ID: 3430
Place-ID: 393
https://www.seilbahntechnik.net/en/lifts/3430/datas.htm
Datas: 20 août 2022
PHOTOS: ??
Lift-Statistics
18489 visit(s) since 6 oct. 2003
Last visit 15 nov. 2025
LIFT-WORLD IDs
Lift-ID: 3430
Place-ID: 393
https://www.seilbahntechnik.net/en/lifts/3430/datas.htm

Deutsch
English
Français
Italiano
Česky
Nederlands

