Lift-Database » Lifts in the world
8-MGD Hochgurglbahn I
Valley station
Valley station
Line
General information | |
---|---|
Place | Hochgurgl |
resort | Obergurgl-Hochgurgl |
Region | Tyrol |
Country | |
Name of lift | Hochgurglbahn I |
Type | 8-MGD |
Lift manufacturer | Leitner |
Year of construction | 2001 |
Commissioning date | ?? |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
Through operation with Hochgurglbahn 2. |
geometric data | |
---|---|
Height of valley station | 1789 m |
Height of mountain station | 2160 m |
Vertical rise | 371 m |
Route distance | 911 m |
Horizontal length | ?? m |
Average incline | 44,56 % |
Largest incline | 74,30 % |
Number of pillars | 7 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | 5,5 m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 2489 Pers/h |
Travel time | 2,7 min |
Driving speed line | 6,0 m/s |
Driving speed station | ?? m/s |
electrical data | |
---|---|
Electrical control | Elin |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | 560 kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Middle station |
Drive type | ?? |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Swoboda |
Cab model | ULTRA 8 S |
Seating | carpet |
Seat heater | no |
Heater | ?? |
Aircon | ?? |
Persons per cab | 8 |
Number of cabs | 32 Stk |
Cab distance | ?? m |
Cab interval | ?? s |
Garage type | underground |
Garage place | mountain station |
Garage direction | forward |
Loading direction | forward |
rope data | |
---|---|
Rope manufacturer | Fatzer |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | 48 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | ?? |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Drive direction | right |
Construction costs | ?? |
Currency (Construction costs) | ?? |
Construction period | 4,5 months |
Seasontime | ❄ winter |
Evacuation ropeway | no |
Integrated rescue system | ?? |
Rope position control | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: 18/03/24
PHOTOS: ??
Lift-Statistics
19261 visit(s) since 25/12/02
Last visit 16/11/24
LIFT-WORLD IDs
Lift-ID: 420
Place-ID: 61
https://www.seilbahntechnik.net/en/lifts/420/datas.htm
Datas: 18/03/24
PHOTOS: ??
Lift-Statistics
19261 visit(s) since 25/12/02
Last visit 16/11/24
LIFT-WORLD IDs
Lift-ID: 420
Place-ID: 61
https://www.seilbahntechnik.net/en/lifts/420/datas.htm