Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Hochgurglbahn I

Valley station
Valley station

Valley station
Valley station

Line
Line

General information  
Place Hochgurgl 
resort Obergurgl-Hochgurgl 
Region Tyrol 
Country   
Name of lift Hochgurglbahn I 
Type 8-MGD 
Lift manufacturer Leitner 
Year of construction 2001 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Through operation with Hochgurglbahn 2.

geometric data  
Height of valley station 1789 m
Height of mountain station 2160 m
Vertical rise 371 m
Route distance 911 m
Horizontal length ?? m
Average incline 44,56 %
Largest incline 74,30 %
Number of pillars 7 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,5 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2489 Pers/h
Travel time 2,7 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 560 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Middle station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Swoboda 
Cab model ULTRA 8 S 
Seating carpet 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab
Number of cabs 32 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground 
Garage place mountain station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 4,5 months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 18/03/24
PHOTOS: ??

Lift-Statistics
19262 visit(s) since 25/12/02
Last visit 16/11/24

LIFT-WORLD IDs
Lift-ID: 420
Place-ID: 61

https://www.seilbahntechnik.net/en/lifts/420/datas.htm