Lift-Database » Lifts in the world
4-CLD/B Chuenisbärgli
Mountain station
Line
General information | |
---|---|
Place | Adelboden |
resort | Adelboden-Lenk |
Region | Berne |
Country | |
Name of lift | Chuenisbärgli |
Type | 4-CLD/B |
Lift manufacturer | Garaventa |
Year of construction | 2005 |
Commissioning date | ?? |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 1305 m |
Height of mountain station | 1741 m |
Vertical rise | 436 m |
Route distance | 1335 m |
Horizontal length | ?? m |
Average incline | ?? % |
Largest incline | ?? % |
Number of pillars | 9 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 1200 Pers/h |
Travel time | ?? min |
Driving speed line | 5 m/s |
Driving speed station | ?? m/s |
electrical data | |
---|---|
Electrical control | ?? |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | 265 kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Mountain station |
Drive type | electrical |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | DT 104 |
Cab manufacturer | Garaventa |
Cab model | 4E98/B |
Bubble colour | neutral |
Seating | leather |
Seat heater | no |
Persons per cab | 4 |
Number of cabs | 51 Stk |
Cab distance | ?? m |
Cab interval | ?? s |
Garage type | ?? |
Garage place | valley station |
Garage direction | ?? |
Loading direction | ?? |
rope data | |
---|---|
Rope manufacturer | Teufelberger |
Length of haul rope | 2760 m |
Total weight of haul rope | ?? t |
Haul rope diameter | 41 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Drive direction | left |
Construction costs | ?? CHF |
Currency (Construction costs) | Swiss franc |
Construction period | ?? months |
Seasontime | ❄ winter |
Situation of entrance | 90° |
Situation of exit | parallel |
Loading carpet | no |
Evacuation ropeway | ?? |
Integrated rescue system | ?? |
Rope position control | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: 09/06/20
PHOTOS: ??
Lift-Statistics
13588 visit(s) since 01/09/05
Last visit 04/12/24
LIFT-WORLD IDs
Lift-ID: 7806
Place-ID: 128
https://www.seilbahntechnik.net/en/lifts/7806/datas.htm
Datas: 09/06/20
PHOTOS: ??
Lift-Statistics
13588 visit(s) since 01/09/05
Last visit 04/12/24
LIFT-WORLD IDs
Lift-ID: 7806
Place-ID: 128
https://www.seilbahntechnik.net/en/lifts/7806/datas.htm