Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD/B Chuenisbärgli

Mountain station
Mountain station

Line
Line




General information  
Place Adelboden 
resort Adelboden-Lenk 
Region Berne 
Country   
Name of lift Chuenisbärgli 
Type 4-CLD/B 
Lift manufacturer Garaventa 
Year of construction 2005 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1305 m
Height of mountain station 1741 m
Vertical rise 436 m
Route distance 1335 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 9 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1200 Pers/h
Travel time ?? min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 265 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 104 
Cab manufacturer Garaventa 
Cab model 4E98/B 
Bubble colour neutral 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 51 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ?? 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope 2760 m
Total weight of haul rope ?? t
Haul rope diameter 41 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? CHF
Currency (Construction costs) Swiss franc 
Construction period ?? months
Seasontime winter 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 09/06/20
PHOTOS: ??

Lift-Statistics
13587 visit(s) since 01/09/05
Last visit 04/12/24

LIFT-WORLD IDs
Lift-ID: 7806
Place-ID: 128

https://www.seilbahntechnik.net/en/lifts/7806/datas.htm